• SAP C_TSCM42_67 Dumps

SAP C_TSCM42_67 Dumps

SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7

    EXAM CODE : C_TSCM42_67

    UPDATION DATE : 2023-03-30

    TOTAL QUESTIONS : 106

    UPDATES : UPTO 3 MONTHS

    GUARANTEE : 100% PASSING GUARANTEE

PDF + TEST ENGINE

$65 $84.5

TEST ENGINE Demo

$55 $71.5

PDF ONLY Demo

$45 $58.5

BEST SAP C_TSCM42_67 DUMPS - PASS YOUR EXAM IN FIRST ATTEMPT

C_TSCM42_67 exam has grabbed the interest of IT students with its rising need and importance in the field. In spite of being a hard core IT exam, it can easily be passed with the help of C_TSCM42_67 dumps material.This highly demanded and results-producing authentic dumps material can be obtained from Exam4help.com. When you will prepare under the guidance of veterans by using additional facilitating services, your certification is stamped with success.

As a favor to our students, we have availed free of cost demo version for quick quality check before going forward. You get here trust, find satisfaction and meet your success with expertly verified C_TSCM42_67 questions answer. You can download PDF study guide right now at very cheap and attractive price and pursue your career with fast pace. Further, it is the place where you get money back guarantee in case of, though not expected, unfortunate happening and you fail to get your desired result in your final exam. In short, you are promised for definite success with student-friendly preparatory solutions. Just join our hands and leap for your successful career.

Sample Questions

Question 1

You select the master data for production orders via production versions.
Which information is contained in a production version?

A. The explosion dates for the routing and BOM

B. The routing and BOM alternatives to be used

C. The default order type to be used

D. The control parameters for selecting routings and BOM

ANSWER : B

Question 2

The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50). There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks. What sequence type would you use to create the second sequence in the system?

A. Substitute sequence

B. Alternative sequence

C. Parallel sequence

D. Standard sequence

ANSWER : B

Question 3

Which functions can be triggered before releasing a production order? (Choose three)

A. Selection of a routing

B. Selection of a BOM

C. Stock determination

D. Confirmation

E. Scheduling

ANSWER : A,B,E

Question 4

You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence.
What do you have to consider in this scenario?

A. Requirements planning considers only changes that are relevant for scheduling within the planning time fence.

B. Planned orders are created within the planning time fence and automatically firmed by requirements planning.

C. The MRP controller cannot create planned orders within the planning time fence.

D. Planned orders that are created by requirements planning are shifted to the end of the planning time fence.

ANSWER : D

Question 5

Where can you define the default storage location for the material component of a production order? (Choose three)

A. Routing

B. Production supply area of a work center

C. BOM header (product)

D. Production version (product)

E. Material master (component)

ANSWER : B,D,E